Construction of a ground-based (greenfield) telecom site in an urban area of Douala, between November 2025 and January 2026. The works, carried out in a confined space between existing buildings, required strict site marking and a safe excavation plan.
After the earthworks, our teams placed the raft reinforcement, formed and cast the reinforced concrete piers and anchor blocks, then erected the tower. The site was handed over with its concrete wall, equipment slabs and gravel platform.
Scope
- Earthworks and marked-off deep excavation
- Foundation raft reinforcement
- Formwork and casting of reinforced concrete piers
- Tower anchor blocks and base plates
- Tower erection
- Concrete wall, equipment slab and gravel platform